• All of your remote power and monitoring needs in one PowerBox™

Water/Wastewater

All of your remote power and monitoring needs in one PowerBox™

Sep 24 2018

This year, Leading Edge Power is showing the 2018 edition of the PowerBox™, the off-grid power system, designed to meet the needs of low power 12VDC/24VDC or AC equipment. The PowerBox has everything needed to provide remote power and monitoring, all fitted into a single, pallet-sized box.

Tank level and temperature monitoring functionality is built into the PowerBox 2018 edition, enabling data from NMEA2000 sensors to be remotely monitored. It is also possible to see how the PowerBox itself is performing.

The PowerBox is easy to transport and quick to deploy – in less than an hour, you can set up a complete solar-wind hybrid power supply comprising of British-made wind turbines and professional-grade solar panels with 21.5% cell efficiency.

Leading Edge Power’s expertise is in designing bespoke off-grid power systems that provide power 24/7 to meet the requirements of equipment. Visit Leading Edge Power at WWEM stand 146 to discuss your specific requirements.


Digital Edition

AET 31.2 Buyers' Guide 2024

February 2024

In This Edition Buyer's Guide Directory - Product Listings by Category - Suppliers Listings (A-Z) Water / Wastewater - Methane Emissions Analysis at Berlin Wastewater Facility - Inter...

View all digital editions

Events

UzChemPlast Expo

Apr 03 2024 Tashkent, Uzbekistan

analytica 2024

Apr 09 2024 Munich, Germany

ChemBio Finland 2024

Apr 10 2024 Helsinki, Finland

View all events