Landfill Monitoring

Water/wastewater

Landfill Monitoring

28 Oct, 2012

Published over 13 years ago. See the latest and most current information on Water/wastewater.

Leachate removal from a landfill well is a primary function. Although different types of pumps are used, all pumps need to be installed with a totalising counter mounted at the top of the well head to monitor the pump cycles and to calculate the total volume of leachate removed from the well. Instead of manually monitoring the leachate level and collecting the pump count data, FlexPower Counter Nodes from Banner Engineering (Belgium) connects wirelessly to send data from the pumps back to a central control location to save time and eliminate errors.

Latest News

IET 36.3 May

Explore our Digital Edition

Discover the latest news and research

Digital edition

Explore Our Other Sites

Labmate Online
High-altitude changes gut microbiota which may drive mountain sickness risk
Explore more Arrow
Pollution Solutions Online
DNV introduces new framework for measuring onboard carbon capture performance
Explore more Arrow
Petro Online
New test method ASTM D8606 has been officially released
Explore more Arrow
Chromatography Today
Affordable liquid chromatography solvent delivery pump
Explore more Arrow