The Work at Height Regulations came into force on 6th April 2005. These regulations cover all industries. The Regulations cover elevated work platforms (including scaffolding and permanent platforms), fragile surfaces (e.g. roofs), and any ladders, gangways and stairways used to get to the elevated workplace.
The regulations apply to:
The regulations require the employer to:
The Regulations also contain specific provisions relating to falling objects and danger areas, inspection of work equipment and inspection of elevated workplaces.
The Regulations contain a number of Schedules describing the specific requirements for existing places of work (encompassing some permanent access to ducts and includes what STA term as permanent platforms at stacks), working platforms (includes temporary platforms created for the job in hand using scaffolding etc), guard rails, ladders, and inspection.
For all working platforms, the requirements focus on the need for the working platform to be of sufficient strength and rigidity, and for the supporting structure to be stable and of sufficient strength and rigidity and resting on a suitable surface. Other conditions cover dimensions of the platform and safety features (e.g. no gaps).
There are specific regulations requiring the employer to carry out inspections of work equipment and pre-use checks of places of work.
Working platforms and associated guard rails, barriers, toe-boards, ladders, etc., must be inspected at the following frequencies:
i. After assembly/ installation but before use;
ii. At suitable intervals where there has been exposure to conditions causing deterioration;
iii. At each time an exceptional circumstance has occurred which is liable to jeopardise its safety; and within 7 days prior to use if the platform is one from which a person could fall more than 2 metres, is used for construction work, or is a mobile platform.
Furthermore, on each occasion before any elevated workplace is used, the employer must check the surface, and every parapet, permanent rail or other such fall protection measure.
This regulation requires that the employer’s inspection is recorded and kept until the next inspection. Inspection is stated as meaning “such visual or more rigorous inspection by a competent person as to be appropriate for safety purposes. This includes any testing appropriate for those purposes”. A specific schedule lists the particulars to be included in the report of inspection.
The Work at Height Regulations 2005 stipulates that new and existing platforms must be subjected to a baseline survey. Platforms can then be subjected to periodic surveys and further inspections prior-to-use. Information concerning these surveys and inspections should be contained on the StackTAG as described below.
The StackTAG has been carefully designed to ensure that persons using a platform can clearly identify its survey/inspection history. Inserts should not be cleaned and reused - entries should be made using a permanent marker pen. The StackTAG inserts can then be used to complement the written inspection records.
For new platforms, the baseline survey is to be carried out after installation but before use. This is, in effect, a commissioning survey. In the case of an existing platform, a baseline survey should be carried out at the earliest opportunity by a suitably competent person (e.g. a Structural Engineer). He or she will report on the platform’s current condition and whether it meets the appropriate specification (refer to STA guidance note WAH 001 for more information). The baseline survey should also state what acceptance criteria should be used for checking that the basic specification continues to be met during future surveys/inspections.
These are to be carried out at prescribed intervals. The frequency of periodic surveys should be risk-based, taking into account the current condition of the platform, deterioration risk-factors and other issues. The frequency of inspection shall be determined by a competent person (e.g. a StructuralEngineer). Further guidance is given in STA guidance note WAH 001.
This is the date when the next periodic survey is due to be undertaken.
Prior-to-use inspections
These are to be carried out within SEVEN days prior to use (if the platform is one from which a person could fall more than two metres).
This inspection has to be carried out by a competent person; however, this could be a member of a site’s own staff who has received suitable and sufficient training from a Structural Engineer on the scope and conduct of prior-to-use inspections. Details of this training shall be formally documented.
The Source Testing Association
The Source Testing Association (STA) was established in 1995 the membership comprises representation from process operators, regulators, equipment suppliers and test laboratories. The STA is a non-profit making organisation.
The STA is committed to the advancement of the science and practice of emission monitoring and to develop and maintain a high quality of service to customers.
Its aims and objectives are to:
(i) Contribute to the development of industry standards, codes, safety procedures and operating principles;
(ii) Encourage the personal and professional development of practicing source testers and students;
(iii) Maintain a body of current sampling knowledge;
(iv) Assist in maintenance of a high level of ethical conduct;
(v) Seek co-operative endeavours with other professional organisations, institutions and regulatory bodies, nationally and internationally, that are engaged in source emissions testing.
The Associations headquarters are based in Hitchin, Hertfordshire with meeting rooms, library and administration offices.
The Association offers a package of benefits to its members which include: