Water/Wastewater

South Wales Land Reclamation Scheme Employs MCerts Approved Monitors for Suspended Solids

Jul 02 2009

Author: Angus Fosten on behalf of Partech Instruments

Free to read

This article has been unlocked and is ready to read.

Download

On the hills above Merthyr Tydfil, Miller Argent is undertaking a highly ambitious land reclamation scheme that is also involving the extraction of coal by surface mining methods. Known as the \\’Ffos-y-fran Land Reclamation Scheme\\’, this is the third and final phase of the East Merthyr Reclamation Scheme which is expected to run for approximately 17 years. The reclamation works will include the removal of known shafts and adits all previously associated with the historic iron ore and coal workings that present a danger to humans, livestock and wild animals.

Free to read

This article has been unlocked and is ready to read.

Download


Digital Edition

IET 34.2 March 2024

April 2024

Gas Detection - Biogas batch fermentation system for laboratory use with automatic gas analysis in real time Water/Wastewater - Upcycling sensors for sustainable nature management - Prist...

View all digital editions

Events

AIHA Connect 2024

May 20 2024 Columbus, OH, USA

Water Expo Nigeria 2024

May 21 2024 Lagos, Nigeria

BWCE 2024

May 23 2024 Beijing, China

CEPE 2024

May 23 2024 Beijing, China

CISILE 2024

May 29 2024 Beijing, China

View all events